Carl Meek & James Lovett - Build Diary for Westfield
||||||||||||
Ready to Drive (hopefully!)


 

March 16 2008 - Ready to Drive (hopefully!)
Did the following things:

* Installed the latest firmware for my MBE992 ECU, and installed a custom-pin map to control the water pump.
* Clipped all the engine-bay wires into place
* Installed a fork-lift truck charging socket, so i dont have to take the bonnet off to charge it
* Replaced the sealing washers, and bled the clutch - hopefully this will hold its pressure
* Replaced bodywork

Then trailered it up and took it for a car-wash! I'll go and take it for a drive as soon as i get the chance.